留言板

尊敬的读者、作者、审稿人, 关于本刊的投稿、审稿、编辑和出版的任何问题, 您可以本页添加留言。我们将尽快给您答复。谢谢您的支持!

姓名
邮箱
手机号码
标题
留言内容
验证码
Volume 14 Issue 1
Feb.  2007
数据统计

分享

计量
  • 文章访问数:  240
  • HTML全文浏览量:  59
  • PDF下载量:  12
  • 被引次数: 0
Meifeng Cai, Mowen Xie, and Chunlei Li, GIS-based 3D limit equilibrium analysis for design optimization of a 600 m high slope in an open pit mine, J. Univ. Sci. Technol. Beijing, 14(2007), No. 1, pp. 1-5. https://doi.org/10.1016/S1005-8850(07)60001-2
Cite this article as:
Meifeng Cai, Mowen Xie, and Chunlei Li, GIS-based 3D limit equilibrium analysis for design optimization of a 600 m high slope in an open pit mine, J. Univ. Sci. Technol. Beijing, 14(2007), No. 1, pp. 1-5. https://doi.org/10.1016/S1005-8850(07)60001-2
引用本文 PDF XML SpringerLink
Mineral

GIS-based 3D limit equilibrium analysis for design optimization of a 600 m high slope in an open pit mine

  • 通讯作者:

    Mowen Xie    E-mail: mowenxie@126.com

  • Combining the GIS (geographic information systems) grid-based data with four proposed column-based 3D slope stability analysis models, a comprehensive solution of a high-steep open-pit slope has been obtained. For six searching ranges, 19 critical slip surfaces of different sizes have been studied, in which the minimum 3D safety factor is 1.33. Comparison of 3D safety factors of designed and proposed slope plans shows for all the critical slip surfaces for the proposed plan, the smallest 3D safety factor is 1.33 under the most unfavorable condition. This means that the proposed plan of the high slopes, about 600 m, of an open pit (2-5° steeper than designed plan) is feasible.
  • Mineral

    GIS-based 3D limit equilibrium analysis for design optimization of a 600 m high slope in an open pit mine

    + Author Affiliations

    Catalog


    • /

      返回文章
      返回