Yongtao Gao, Jianbo Sun, Shunchuan Wu,  and Aibing Jin, Cut slope reinforcement technique in open-pit mines, J. Univ. Sci. Technol. Beijing, 11(2004), No. 4, pp. 289-292.
Cite this article as:
Yongtao Gao, Jianbo Sun, Shunchuan Wu,  and Aibing Jin, Cut slope reinforcement technique in open-pit mines, J. Univ. Sci. Technol. Beijing, 11(2004), No. 4, pp. 289-292.
引用本文 PDF XML SpringerLink
Mineral

Cut slope reinforcement technique in open-pit mines

  • 通讯作者:

    Yongtao Gao    E-mail: gaoyongt@vip.sina.com

  • The design and practice in supporting the cut slope of an open-pit mine were introduced, in which the high pressure grouting method was used in reinforcing the weak formation in the slopes. Based on a detailed geological survey of the slope, a theoretical analysis was carried out, and the design parameters were proposed, where the Tresca or Mohr-Coulomb yield criteria was employed. A patent technology, named "Technology of high pressure and multiple grouting in different levels within a single hole", was employed in the construction. Anchor bars were also installed as grouting proceeds. This method combines anchoring and grouting comprehensively and was found successful in practice.
  • Mineral

    Cut slope reinforcement technique in open-pit mines

    + Author Affiliations
    • The design and practice in supporting the cut slope of an open-pit mine were introduced, in which the high pressure grouting method was used in reinforcing the weak formation in the slopes. Based on a detailed geological survey of the slope, a theoretical analysis was carried out, and the design parameters were proposed, where the Tresca or Mohr-Coulomb yield criteria was employed. A patent technology, named "Technology of high pressure and multiple grouting in different levels within a single hole", was employed in the construction. Anchor bars were also installed as grouting proceeds. This method combines anchoring and grouting comprehensively and was found successful in practice.