WU Qing-yiand DONG Ping, CONSTRUCTION OF SIMULATION SYSTEM AND ITS IMPLEMENTATION FOR JOB DISPATCH OF INPROCESS WAREHOUSE ON FLEXIBLE PRODUCTION LINE, J. Univ. Sci. Technol. Beijing, 3(1996), No. 1, pp. 31-35.
Cite this article as:
WU Qing-yiand DONG Ping, CONSTRUCTION OF SIMULATION SYSTEM AND ITS IMPLEMENTATION FOR JOB DISPATCH OF INPROCESS WAREHOUSE ON FLEXIBLE PRODUCTION LINE, J. Univ. Sci. Technol. Beijing, 3(1996), No. 1, pp. 31-35.

CONSTRUCTION OF SIMULATION SYSTEM AND ITS IMPLEMENTATION FOR JOB DISPATCH OF INPROCESS WAREHOUSE ON FLEXIBLE PRODUCTION LINE

+ Author Affiliations
  • Received: 10 September 1995
  • The constructing method of a simulation system is discussed in this paper. It is for a Decision Support System (DSS) of main in-process warehouse on a large scale flexible production line. This system is decomposed into three function blocks: DSS, support environment for simulation, simulating dispatch module. It has a fine structure and works coordinatively to complete whatever assignment for simulation tasks of a complicated production system.
  • loading
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Share Article

    Article Metrics

    Article Views(300) PDF Downloads(10) Cited by()
    Proportional views

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return