WU Qing-yiand DONG Ping, CONSTRUCTION OF SIMULATION SYSTEM AND ITS IMPLEMENTATION FOR JOB DISPATCH OF INPROCESS WAREHOUSE ON FLEXIBLE PRODUCTION LINE, J. Univ. Sci. Technol. Beijing, 3(1996), No. 1, pp. 31-35.
Cite this article as:
WU Qing-yiand DONG Ping, CONSTRUCTION OF SIMULATION SYSTEM AND ITS IMPLEMENTATION FOR JOB DISPATCH OF INPROCESS WAREHOUSE ON FLEXIBLE PRODUCTION LINE, J. Univ. Sci. Technol. Beijing, 3(1996), No. 1, pp. 31-35.
WU Qing-yiand DONG Ping, CONSTRUCTION OF SIMULATION SYSTEM AND ITS IMPLEMENTATION FOR JOB DISPATCH OF INPROCESS WAREHOUSE ON FLEXIBLE PRODUCTION LINE, J. Univ. Sci. Technol. Beijing, 3(1996), No. 1, pp. 31-35.
Citation:
WU Qing-yiand DONG Ping, CONSTRUCTION OF SIMULATION SYSTEM AND ITS IMPLEMENTATION FOR JOB DISPATCH OF INPROCESS WAREHOUSE ON FLEXIBLE PRODUCTION LINE, J. Univ. Sci. Technol. Beijing, 3(1996), No. 1, pp. 31-35.
The constructing method of a simulation system is discussed in this paper. It is for a Decision Support System (DSS) of main in-process warehouse on a large scale flexible production line. This system is decomposed into three function blocks: DSS, support environment for simulation, simulating dispatch module. It has a fine structure and works coordinatively to complete whatever assignment for simulation tasks of a complicated production system.