Guoming Cheng, Sijing Wang, and Meifeng Cai, Feasibility study of highwall mining in north surface mine of Yima Coal Corporation, China, J. Univ. Sci. Technol. Beijing, 10(2003), No. 6, pp. 1-4.
Cite this article as:
Guoming Cheng, Sijing Wang, and Meifeng Cai, Feasibility study of highwall mining in north surface mine of Yima Coal Corporation, China, J. Univ. Sci. Technol. Beijing, 10(2003), No. 6, pp. 1-4.
Mineral

Feasibility study of highwall mining in north surface mine of Yima Coal Corporation, China

+ Author Affiliations
  • Yima Coal Corporation is considering to adopt highwall mining method with auger machine to recover coal from north surface pit that has reached final highwall position. The major geomechanical issues associated with auger mining are highwall and pillar stability. Based on the field investigation and laboratory test results of mechanical parameters, numerical modeling is carried out to assess the stability of highwall and pillar. Field measurements of highwall deformation have been used to validate and ensure the confidence for the development of realistic models. The results of numerical modeling show that the mining method is feasible for mining the seam of 10 m thickness in north surface coal mine.
  • loading
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Share Article

    Article Metrics

    Article Views(433) PDF Downloads(27) Cited by()
    Proportional views

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return