留言板

尊敬的读者、作者、审稿人, 关于本刊的投稿、审稿、编辑和出版的任何问题, 您可以本页添加留言。我们将尽快给您答复。谢谢您的支持!

姓名
邮箱
手机号码
标题
留言内容
验证码
Volume 10 Issue 4
Aug.  2003
数据统计

分享

计量
  • 文章访问数:  299
  • HTML全文浏览量:  92
  • PDF下载量:  15
  • 被引次数: 0
Qi Zhang and Dachao Lin, Influence of delay interval on blasting efficiency of parallel hole cuts with an empty hole, J. Univ. Sci. Technol. Beijing, 10(2003), No. 4, pp. 12-15.
Cite this article as:
Qi Zhang and Dachao Lin, Influence of delay interval on blasting efficiency of parallel hole cuts with an empty hole, J. Univ. Sci. Technol. Beijing, 10(2003), No. 4, pp. 12-15.
引用本文 PDF XML SpringerLink
Mineral

Influence of delay interval on blasting efficiency of parallel hole cuts with an empty hole

  • 通讯作者:

    Qi Zhang    E-mail: qzhang@bit.edu.cn

  • Time interval of short delay ignition is an important factor to affect the efficiency of blasting cuts. The motion process of rock pieces in the cut cavity is analyzed, a mechanical model to calculate the delay time of parallel hole cuts is presented for tunnel blasting, and a theoretical method to determine the volume ratio (the clearage rate) of the rock pieces within the cut cavity at different moments is proposed for the blasting cut with an empty hole. Numerical analysis results show that the optimal delay interval is proportional to the borehole depth. The suggested results are of practical value to the optimal design of the delay interval in millisecond blasting related to the parallel hole cuts with an empty hole.
  • Mineral

    Influence of delay interval on blasting efficiency of parallel hole cuts with an empty hole

    + Author Affiliations
    • Time interval of short delay ignition is an important factor to affect the efficiency of blasting cuts. The motion process of rock pieces in the cut cavity is analyzed, a mechanical model to calculate the delay time of parallel hole cuts is presented for tunnel blasting, and a theoretical method to determine the volume ratio (the clearage rate) of the rock pieces within the cut cavity at different moments is proposed for the blasting cut with an empty hole. Numerical analysis results show that the optimal delay interval is proportional to the borehole depth. The suggested results are of practical value to the optimal design of the delay interval in millisecond blasting related to the parallel hole cuts with an empty hole.
    • loading

    Catalog


    • /

      返回文章
      返回