Ke Liu, Zhichun Mu, Datai Yu, Dal Koshal, and David Pearce, Improved Algebraic Model for Serial Production Lines with Limited Buffer Sizes, J. Univ. Sci. Technol. Beijing, 6(1999), No. 2, pp. 139-143.
Cite this article as:
Ke Liu, Zhichun Mu, Datai Yu, Dal Koshal, and David Pearce, Improved Algebraic Model for Serial Production Lines with Limited Buffer Sizes, J. Univ. Sci. Technol. Beijing, 6(1999), No. 2, pp. 139-143.
Ke Liu, Zhichun Mu, Datai Yu, Dal Koshal, and David Pearce, Improved Algebraic Model for Serial Production Lines with Limited Buffer Sizes, J. Univ. Sci. Technol. Beijing, 6(1999), No. 2, pp. 139-143.
Citation:
Ke Liu, Zhichun Mu, Datai Yu, Dal Koshal, and David Pearce, Improved Algebraic Model for Serial Production Lines with Limited Buffer Sizes, J. Univ. Sci. Technol. Beijing, 6(1999), No. 2, pp. 139-143.
Information Engineering School,University, of Science and Technology Beijing, Beijing 100083, China
School of Engineering, University of Brighton, Brighton Brighton BN2 4GJ, UK
中文摘要
The ordered event model is improved to describe serial production lines with limited buffer sizes. The improved model has the same computational burden as the original one and can be constructed directly according to given principles. Several simulation examples are cited to verify this improved model. Extensions and open problems are also indicated. By means of this new model, serial produotion lines with limitations of resources can be studied analytically.
The ordered event model is improved to describe serial production lines with limited buffer sizes. The improved model has the same computational burden as the original one and can be constructed directly according to given principles. Several simulation examples are cited to verify this improved model. Extensions and open problems are also indicated. By means of this new model, serial produotion lines with limitations of resources can be studied analytically.