留言板

尊敬的读者、作者、审稿人, 关于本刊的投稿、审稿、编辑和出版的任何问题, 您可以本页添加留言。我们将尽快给您答复。谢谢您的支持!

姓名
邮箱
手机号码
标题
留言内容
验证码
Volume 11 Issue 5
Oct.  2004
数据统计

分享

计量
  • 文章访问数:  278
  • HTML全文浏览量:  78
  • PDF下载量:  13
  • 被引次数: 0
Ying Zhang, Yong Zhao, Qiwei Lu, and Wenli Xu, Optimization model of truck flow at open-pit mines and standards for feasibility test, J. Univ. Sci. Technol. Beijing, 11(2004), No. 5, pp. 389-393.
Cite this article as:
Ying Zhang, Yong Zhao, Qiwei Lu, and Wenli Xu, Optimization model of truck flow at open-pit mines and standards for feasibility test, J. Univ. Sci. Technol. Beijing, 11(2004), No. 5, pp. 389-393.
引用本文 PDF XML SpringerLink
Mineral

Optimization model of truck flow at open-pit mines and standards for feasibility test

  • 通讯作者:

    Ying Zhang    E-mail: zhang-ying@tsinghua.edu.cn

  • In order to increase production efficiency at open-pit mines, on the basis of linear programming, a practical mathematical model for optimizing truck flow was developed, which improved the traditional fixed manual schedule method. The model has advantages from linear programming and objective programming, makes most handling points working at full capacity and keeps an optimized ratio between trucks and excavators. For ensuring feasibility of the model in practical production, four standards for feasibility test were proposed. The model satisfied all the standards. The application in a large scale open-pit iron mine indicated that the model reduced the number of required trucks by 10% compared with the fixed manual schedule method.
  • Mineral

    Optimization model of truck flow at open-pit mines and standards for feasibility test

    + Author Affiliations
    • In order to increase production efficiency at open-pit mines, on the basis of linear programming, a practical mathematical model for optimizing truck flow was developed, which improved the traditional fixed manual schedule method. The model has advantages from linear programming and objective programming, makes most handling points working at full capacity and keeps an optimized ratio between trucks and excavators. For ensuring feasibility of the model in practical production, four standards for feasibility test were proposed. The model satisfied all the standards. The application in a large scale open-pit iron mine indicated that the model reduced the number of required trucks by 10% compared with the fixed manual schedule method.
    • loading

    Catalog


    • /

      返回文章
      返回