留言板

尊敬的读者、作者、审稿人, 关于本刊的投稿、审稿、编辑和出版的任何问题, 您可以本页添加留言。我们将尽快给您答复。谢谢您的支持!

姓名
邮箱
手机号码
标题
留言内容
验证码
Volume 10 Issue 6
Dec.  2003
数据统计

分享

计量
  • 文章访问数:  414
  • HTML全文浏览量:  115
  • PDF下载量:  27
  • 被引次数: 0
Guoming Cheng, Sijing Wang,  and Meifeng Cai, Feasibility study of highwall mining in north surface mine of Yima Coal Corporation, China, J. Univ. Sci. Technol. Beijing, 10(2003), No. 6, pp. 1-4.
Cite this article as:
Guoming Cheng, Sijing Wang,  and Meifeng Cai, Feasibility study of highwall mining in north surface mine of Yima Coal Corporation, China, J. Univ. Sci. Technol. Beijing, 10(2003), No. 6, pp. 1-4.
引用本文 PDF XML SpringerLink
Mineral

Feasibility study of highwall mining in north surface mine of Yima Coal Corporation, China

  • 通讯作者:

    Guoming Cheng    E-mail: guomingcheng@sohu.com

  • Yima Coal Corporation is considering to adopt highwall mining method with auger machine to recover coal from north surface pit that has reached final highwall position. The major geomechanical issues associated with auger mining are highwall and pillar stability. Based on the field investigation and laboratory test results of mechanical parameters, numerical modeling is carried out to assess the stability of highwall and pillar. Field measurements of highwall deformation have been used to validate and ensure the confidence for the development of realistic models. The results of numerical modeling show that the mining method is feasible for mining the seam of 10 m thickness in north surface coal mine.
  • Mineral

    Feasibility study of highwall mining in north surface mine of Yima Coal Corporation, China

    + Author Affiliations
    • Yima Coal Corporation is considering to adopt highwall mining method with auger machine to recover coal from north surface pit that has reached final highwall position. The major geomechanical issues associated with auger mining are highwall and pillar stability. Based on the field investigation and laboratory test results of mechanical parameters, numerical modeling is carried out to assess the stability of highwall and pillar. Field measurements of highwall deformation have been used to validate and ensure the confidence for the development of realistic models. The results of numerical modeling show that the mining method is feasible for mining the seam of 10 m thickness in north surface coal mine.
    • loading

    Catalog


    • /

      返回文章
      返回