Zhi-min Lü, Tian-ru Jiang, and Zai-wei Li, Multiproduct and multistage integrated production planning model and algorithm based on an available production capacity network, Int. J. Miner. Metall. Mater., 28(2021), No. 8, pp. 1343-1352. https://doi.org/10.1007/s12613-021-2310-6
Cite this article as:
Zhi-min Lü, Tian-ru Jiang, and Zai-wei Li, Multiproduct and multistage integrated production planning model and algorithm based on an available production capacity network, Int. J. Miner. Metall. Mater., 28(2021), No. 8, pp. 1343-1352. https://doi.org/10.1007/s12613-021-2310-6
Research Article

Multiproduct and multistage integrated production planning model and algorithm based on an available production capacity network

+ Author Affiliations
  • Corresponding author:

    Zhi-min Lü    E-mail: lvzhimin@nercar.ustb.edu.cn

  • Received: 28 February 2021Revised: 27 May 2021Accepted: 31 May 2021Available online: 1 June 2021
  • This research attempts to devise a multistage and multiproduct short-term integrative production plan that can dynamically change based on the order priority and virtual occupancy for application in steel plants. Considering factors such as the delivery time, varietal compatibility between different products, production capacity of variety per hour, minimum or maximum batch size, and transfer time, we propose an available production capacity network with varietal compatibility and virtual occupancy for enhancing production plan implementation and quick adjustment in the case of dynamic production changes. Here available means the remaining production capacity after virtual occupancy. To quickly build an available production capacity network and increase the speed of algorithm solving, constraint selection and cutting methods with order priority were used for model solving. Finally, the genetic algorithm improved with local search was used to optimize the proposed production plan and significantly reduce the order delay rate. The validity of the proposed model and algorithm was numerically verified by simulating actual production practices. The simulation results demonstrate that the model and improved algorithm result in an effective production plan.

  • loading
  • [1]
    Z. Zheng, S.P. Huang, J.Y. Long, and X.Q. Gao, Synergetic method between materials flow and energy flow in iron and steel intelligent manufacturing, Chin. J. Eng., 39(2017), No. 1, p. 115.
    [2]
    A. Kusiak, Smart manufacturing, Int. J. Prod. Res., 56(2018), No. 1-2, p. 508. doi: 10.1080/00207543.2017.1351644
    [3]
    Y.N. Qi, Z.G. Mao, M. Zhang, and H.F. Guo, Manufacturing practices and servitization: The role of mass customization and product innovation capabilities, Int. J. Prod. Econ., 228(2020), art. No. 107747. doi: 10.1016/j.ijpe.2020.107747
    [4]
    J.Y. Long, Z. Zheng, and X.Q. Gao, Dynamic scheduling in steelmaking-continuous casting production for continuous caster breakdown, Int. J. Prod. Res., 55(2017), No. 11, p. 3197. doi: 10.1080/00207543.2016.1268277
    [5]
    Z.J. Xu, Z. Zheng, and X.Q. Gao, Operation optimization of the steel manufacturing process: A brief review, Int. J. Miner. Metall. Mater., 28(2021), No. 8, p. 1274.
    [6]
    R.Y. Yin, Case study, [in] R.Y. Yin, ed., Theory and Methods of Metallurgical Process Integration, Academic Press, London, 2016, p. 179.
    [7]
    B. Zhang, G.S. Wang, Y. Yang, and S. Zhang, Solving the order planning problem at the steelmaking shops by considering logistics balance on the plant-wide process, IEEE Access, 7(2019), p. 139938. doi: 10.1109/ACCESS.2019.2937659
    [8]
    J.H. Lin, M. Liu, J.H. Hao, and P. Gu, Many-objective harmony search for integrated order planning in steelmaking-continuous casting-hot rolling production of multi-plants, Int. J. Prod. Res., 55(2017), No. 14, p. 4003. doi: 10.1080/00207543.2016.1232498
    [9]
    S. Lu, H.Y. Su, C. Johnsson, H.S. Shao, and L. Xie, A chance constrained programming approach for multi-product multi-stage integrated production planning under internal and external uncertainties, [in] 2015 IEEE International Conference on Automation Science and Engineering (CASE), Gothenburg, 2015, p. 880.
    [10]
    A. Witt and S. Voss, Application of a mathematical model to an intermediate- to long-term real-world steel production planning problem based on standard software, Eur. J. Ind. Eng., 5(2011), No. 1, p. 81. doi: 10.1504/EJIE.2011.037227
    [11]
    K. Altendorfer and S. Minner, Simultaneous optimization of capacity and planned lead time in a two-stage production system with different customer due dates, Eur. J. Oper. Res., 213(2011), No. 1, p. 134. doi: 10.1016/j.ejor.2011.03.006
    [12]
    J.H. Lin, M. Liu, J.H. Hao, and S.L. Jiang, A multi-objective optimization approach for integrated production planning under interval uncertainties in the steel industry, Comput. Oper. Res., 72(2016), p. 189. doi: 10.1016/j.cor.2016.03.002
    [13]
    S. Wang, Y.R. Shi, and S.X. Liu, Integrated scheduling for steelmaking continuous casting—hot rolling processes considering hot chain logistics, Math. Probl. Eng., 2020(2020), art. No. 6902934.
    [14]
    S.P. Yuan, T.K. Li, and B.L. Wang, Improved fast elitist non-dominated sorting genetic algorithm for multi-objective steelmaking-continuous casting production scheduling, Comput. Integr. Manuf. Syst., 25(2019), No. 1, p. 115.
    [15]
    W.J. Xu, L.X. Tang, and E.N. Pistikopoulos, Modeling and solution for steelmaking scheduling with batching decisions and energy constraints, Comput. Chem. Eng., 116(2018), p. 368. doi: 10.1016/j.compchemeng.2018.03.010
    [16]
    Z.M. Lv and J.Z. Du, Order acceptance and capacity balance for steel plant based on production capacity network flow, [in] R.L. Dou, ed., Proceedings of 2012 3rd International Asia Conference on Industrial Engineering and Management Innovation (IEMI2012), Springer, Berlin, Heidelberg, 2013, p. 97.
    [17]
    M.O. Ball, C.Y. Chen, and Z.Y. Zhao, Available to promise, [in] D. Simchi-Levi, S.D. Wu, Z.J. Shen, eds., Handbook of Quantitative Supply Chain Analysis, Springer, Boston, MA, 2004, p. 447.
    [18]
    Q. Liu, Q. Liu, J.P. Yang, J.S. Zhang, S. Gao, Q.D. Li, B. Wang, B.L. Wang, and T.K. Li, Progress of research on steelmaking-continuous casting production scheduling, Chin. J. Eng., 42(2020), No. 2, p. 144.
    [19]
    M.L. Spearman and M.A. Zazanis, Push and pull production systems: Issues and comparisons, Oper. Res., 40(1992), No. 3, p. 521. doi: 10.1287/opre.40.3.521
    [20]
    W.B. Wang and H.L. Qin, Parallel test using natural coding genetic algorithm, Syst. Eng. Electron., 32(2010), No. 6, p. 1343.
    [21]
    Z. Ruttkay, Constraint satisfaction-A survey, CWI Q., 11(1998), No. 2-3, p. 123.
    [22]
    V. Isoherranen and P. Kess, Production planning optimisation and challenges in steel production: SSAB process review, Int. J. Modell. Oper. Manage., 6(2016), No. 1-2, p. 19.
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Figures(11)  / Tables(2)

    Share Article

    Article Metrics

    Article Views(679) PDF Downloads(41) Cited by()
    Proportional views

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return