Haojun Wu, Min Gong, Renshu Yang, Xiaodong Wu, and Xiangyu Liu, Double-face intelligent hole position planning method for precision blasting in roadways using a computer-controlled drill jumbo, Int. J. Miner. Metall. Mater., 30(2023), No. 6, pp. 1025-1037. https://doi.org/10.1007/s12613-022-2575-4
Cite this article as:
Haojun Wu, Min Gong, Renshu Yang, Xiaodong Wu, and Xiangyu Liu, Double-face intelligent hole position planning method for precision blasting in roadways using a computer-controlled drill jumbo, Int. J. Miner. Metall. Mater., 30(2023), No. 6, pp. 1025-1037. https://doi.org/10.1007/s12613-022-2575-4
Research Article

Double-face intelligent hole position planning method for precision blasting in roadways using a computer-controlled drill jumbo

+ Author Affiliations
  • Corresponding author:

    Min Gong    E-mail: gongmustb@163.com

  • Received: 29 August 2022Revised: 26 October 2022Accepted: 23 November 2022Available online: 24 November 2022
  • To solve the uneven burden of same-type holes reducing the blasting efficiency due to the limitation of drilling equipment, we need a double-face program-controlled planning method for hole position parameters used on a computer-controlled drilling jumbo. The cross-section splits into even and uneven areas. It also considers the uneven burden at the hole’s entrance and bottom. In the uneven area, various qualifying factors are made to optimize the hole spacing and maximize the burden uniformity, combined with the features of the area edges and grid-based segmentation methods. The hole position coordinates and angles in the even area are derived using recursion and iteration algorithms. As a case, this method presents all holes in a 4.8 m wide and 3.6 m high cross-section. Compared with the design produced by the drawing method, our planning in the uneven area improved the standard deviation of the hole burden by 40%. The improved hole layout facilitates the evolution of precise, efficient, and intelligent blasting in underground mines.
  • loading
  • Supplementary Information-s12613-022-2575-4.docx
  • [1]
    P. Xu, R.S. Yang, J.J. Zuo, et al., Research progress of the fundamental theory and technology of rock blasting, Int. J. Miner. Metall. Mater., 29(2022), No. 4, p. 705. doi: 10.1007/s12613-022-2464-x
    [2]
    Y.T. Gao, T.H. Wu, and Y. Zhou, Application and prospective of 3D printing in rock mechanics: A review, Int. J. Miner. Metall. Mater., 28(2021), No. 1, p. 1. doi: 10.1007/s12613-020-2119-8
    [3]
    G. Ganesan and A.K. Mishra, Assessment of drilling inaccuracy and delineation of constructional and geological overbreak, Tunnelling Underground Space Technol., 108(2021), art. No. 103730. doi: 10.1016/j.tust.2020.103730
    [4]
    J. Navarro, P. Segarra, J.A. Sanchidrián, R. Castedo, and L.M. López, Assessment of drilling deviations in underground operations, Tunnelling Underground Space Technol., 83(2019), p. 254. doi: 10.1016/j.tust.2018.10.003
    [5]
    K. Soroush, Y. Mehdi, and E. Arash, Trend analysis and comparison of basic parameters for tunnel blast design models, Int. J. Min. Sci. Technol., 25(2015), No. 4, p. 595. doi: 10.1016/j.ijmst.2015.05.012
    [6]
    J. Liu, P.Y. Sun, F.X. Liu, and M.S. Zhao, Design and optimization for bench blast based on Voronoi diagram, Int. J. Rock Mech. Min. Sci., 66(2014), p. 30. doi: 10.1016/j.ijrmms.2013.11.012
    [7]
    M.P. Roy, P.K. Singh, M. Sarim, and L.S. Shekhawat, Blast design and vibration control at an underground metal mine for the safety of surface structures, Int. J. Rock Mech. Min. Sci., 83(2016), p. 107. doi: 10.1016/j.ijrmms.2016.01.003
    [8]
    M. Galende-Hernández, M. Menéndez, M.J. Fuente, and G.I. Sainz-Palmero, Monitor-While-Drilling-based estimation of rock mass rating with computational intelligence: The case of tunnel excavation front, Autom. Constr., 93(2018), p. 325. doi: 10.1016/j.autcon.2018.05.019
    [9]
    Y. Kim and A. Bruland, Analysis and evaluation of tunnel contour quality index, Autom. Constr., 99(2019), p. 223. doi: 10.1016/j.autcon.2018.12.008
    [10]
    E. Costamagna, C. Oggeri, P. Segarra, R. Castedo, and J. Navarro, Assessment of contour profile quality in D&B tunnelling, Tunnelling Underground Space Technol., 75(2018), p. 67. doi: 10.1016/j.tust.2018.02.007
    [11]
    J. Karliński, E. Rusiński, and T. Lewandowski, New generation automated drilling machine for tunnelling and underground mining work, Autom. Constr., 17(2008), No. 3, p. 224. doi: 10.1016/j.autcon.2007.05.007
    [12]
    L. Lin, Y.C. Lv, H. Guo, et al., Load validity discrimination for telescopic boom of rock drilling jumbo, Autom. Constr., 141(2022), art. No. 104439. doi: 10.1016/j.autcon.2022.104439
    [13]
    Y. Kim and H.K. Moon, Application of the guideline for overbreak control in granitic rock masses in Korean tunnels, Tunnelling Underground Space Technol., 35(2013), p. 67. doi: 10.1016/j.tust.2012.11.008
    [14]
    Y.J. Wang, C. Fang, Q.M. Jiang, and S.N. Ahmed, The automatic drilling system of 6R-2P mining drill jumbos, Adv. Mech. Eng., 7(2015), No. 2, art. No. 504861. doi: 10.1155/2015/504861
    [15]
    J. Navarro, J.A. Sanchidrian, P. Segarra, R. Castedo, C. Paredes, and L.M. Lopez, On the mutual relations of drill monitoring variables and the drill control system in tunneling operations, Tunnelling Underground Space Technol., 72(2018), p. 294. doi: 10.1016/j.tust.2017.10.011
    [16]
    H.B. Amnieh, A. Siamaki, and S. Soltani, Design of blasting pattern in proportion to the peak particle velocity (PPV): Artificial neural networks approach, Saf. Sci., 50(2012), No. 9, p. 1913. doi: 10.1016/j.ssci.2012.05.008
    [17]
    N.K. Bhagat, A.K. Mishra, R.K. Singh, C. Sawmliana, and P.K. Singh, Application of logistic regression, CART and random forest techniques in prediction of blast-induced slope failure during reconstruction of railway rock-cut slopes, Eng. Fail. Anal., 137(2022), art. No. 106230. doi: 10.1016/j.engfailanal.2022.106230
    [18]
    N. Ahsan, S. Scheding, S.T. Monteiro, R. Leung, C. McHugh, and D. Robinson, Adaptive sampling applied to blast-hole drilling in surface mining, Int. J. Rock Mech. Min. Sci., 75(2015), p. 244. doi: 10.1016/j.ijrmms.2015.01.009
    [19]
    Q. Shen, Y.J. Wang, R.L. Cao, and Y.R. Liu, Efficiency evaluation of a percussive drill rig using rate-energy ratio based on rock drilling tests, J. Pet. Sci. Eng., 217(2022), art. No. 110873. doi: 10.1016/j.petrol.2022.110873
    [20]
    M.N. Wang, S.G. Zhao, J.J. Tong, et al., Intelligent classification model of surrounding rock of tunnel using drilling and blasting method, Underground Space, 6(2021), No. 5, p. 539. doi: 10.1016/j.undsp.2020.10.001
    [21]
    X.D. Wu, M. Gong, H.J. Wu, and X.Y. Liu, Parameter calculation of the initiating circuit with mixed use of nonel detonators and electronic detonators in tunnel controlled-blasting, Tunnelling Underground Space Technol., 113(2021), art. No. 103975. doi: 10.1016/j.tust.2021.103975
    [22]
    H.X. Fu, L.N.Y. Wong, Y. Zhao, Z. Shen, C.P. Zhang, and Y.Z. Li, Comparison of excavation damage zones resulting from blasting with nonel detonators and blasting with electronic detonators, Rock Mech. Rock Eng., 47(2014), No. 2, p. 809. doi: 10.1007/s00603-013-0419-2
    [23]
    X.Y. Qiu, X.Z. Shi, Y.G. Gou, J. Zhou, H. Chen, and X.F. Huo, Short-delay blasting with single free surface: Results of experimental tests, Tunnelling Underground Space Technol., 74(2018), p. 119. doi: 10.1016/j.tust.2018.01.014
    [24]
    S. Zare and A. Bruland, Comparison of tunnel blast design models, Tunnelling Underground Space Technol., 21(2006), No. 5, p. 533. doi: 10.1016/j.tust.2005.09.001
    [25]
    A.H. Salum and V.M.S.R. Murthy, Optimising blast pulls and controlling blast-induced excavation damage zone in tunnelling through varied rock classes, Tunnelling Underground Space Technol., 85(2019), p. 307. doi: 10.1016/j.tust.2018.11.029
    [26]
    J.G. Kim and J.J. Song, Abrasive water jet cutting methods for reducing blast-induced ground vibration in tunnel excavation, Int. J. Rock Mech. Min. Sci., 75(2015), p. 147. doi: 10.1016/j.ijrmms.2014.12.011
    [27]
    X.X. Tian, Z.P. Song, and J.B. Wang, Study on the propagation law of tunnel blasting vibration in stratum and blasting vibration reduction technology, Soil Dyn. Earthquake Eng., 126(2019), art. No. 105813. doi: 10.1016/j.soildyn.2019.105813
    [28]
    D. Huang, S. Cui, and X.Q. Li, Wavelet packet analysis of blasting vibration signal of mountain tunnel, Soil Dyn. Earthquake Eng., 117(2019), p. 72. doi: 10.1016/j.soildyn.2018.11.025
  • 加载中

Catalog

    通讯作者: 陈斌, bchen63@163.com
    • 1. 

      沈阳化工大学材料科学与工程学院 沈阳 110142

    1. 本站搜索
    2. 百度学术搜索
    3. 万方数据库搜索
    4. CNKI搜索

    Figures(17)  / Tables(1)

    Share Article

    Article Metrics

    Article Views(561) PDF Downloads(46) Cited by()
    Proportional views

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return