WU Qing-yi, and DONG Ping, CONSTRUCTION OF SIMULATION SYSTEM AND ITS IMPLEMENTATION FOR JOB DISPATCH OF INPROCESS WAREHOUSE ON FLEXIBLE PRODUCTION LINE, J. Univ. Sci. Technol. Beijing , 3(1996), No. 1, pp.31-35.
Cite this article as: WU Qing-yi, and DONG Ping, CONSTRUCTION OF SIMULATION SYSTEM AND ITS IMPLEMENTATION FOR JOB DISPATCH OF INPROCESS WAREHOUSE ON FLEXIBLE PRODUCTION LINE, J. Univ. Sci. Technol. Beijing , 3(1996), No. 1, pp.31-35.

CONSTRUCTION OF SIMULATION SYSTEM AND ITS IMPLEMENTATION FOR JOB DISPATCH OF INPROCESS WAREHOUSE ON FLEXIBLE PRODUCTION LINE

  • The constructing method of a simulation system is discussed in this paper. It is for a Decision Support System (DSS) of main in-process warehouse on a large scale flexible production line. This system is decomposed into three function blocks: DSS, support environment for simulation, simulating dispatch module. It has a fine structure and works coordinatively to complete whatever assignment for simulation tasks of a complicated production system.
  • loading

Catalog

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return